
Quality & certificates
Checked at every step, run before it ships.
How we control quality from incoming parts to the trial run — and the patents behind our clamping and hydraulic designs.
Inspection
Five checkpoints on every machine
Incoming parts
Purchased components — valves, hydraulic motors, controllers, barrels and seals — are checked on arrival.
Machined parts
Platens and frames are machined on our own gantry and CNC machining centers and measured before assembly.
Assembly checks
Clamping parallelism, table indexing, hydraulic circuits and wiring are checked as each machine is assembled.
Trial run
Every machine is run at the factory; pressure, speed, stroke, time and temperature settings are preset from the trial.
Pre-shipment
Final inspection, safety-device check and packing. Customers can attend the trial or the factory acceptance.
Components
What goes into the machine
Key components come from established suppliers; the exact configuration is listed in each quotation.
Patents
Our own clamping and hydraulic designs
Utility model patents granted to Dongguan Taifu Machinery. Click a certificate to enlarge.
Contact & RFQ
Attend the trial of your machine
Bring your mold and material, or send them ahead. We run the trial and share the settings before shipment.
Request a machine proposal
Enquiry about





